Lay track through marsh and keep your workforce well fed
From Fallen London Wiki
Spoiler warning! This page contains details about Fallen London Actions. |
From: The Next Stretch of Track
This is hungry, gloomy work through difficult terrain. The workers are going to need quite a bit of cheering if they're to regard it in a happy light.
Unlocked with 5 x Basket of Rubbery Pies, 3 x Railway Steel, Terrain Surveyed exactly 3, 10 x Crate of Incorruptible Biscuits, 5 x Solacefruit, Cellar of Wine
Locked with Tracklayers' Work Stoppage, Discovered: a Patch of Frozen Neath
Success
Picnic in the wetlands
Furnace accepts your payment with a smile.[...]
A week or two after work has begun […] something unusual has turned up[...]
[...]icy coil of dead snake – or is it a large worm? […]Something with eyes and without scales[...]
"[...]a patch of frozen ground.[…]"Description summary:
The workforce hit hard earth that is full of bizarre limbless things. They need the Board to pass an alternative work-plan.
[Find the rest of the story at https://www.fallenlondon.com]
- You now have 1 x Track Laid
- You've lost 3 x Railway Steel
- You've gained 1 x Supporting the Emancipationist Tracklayers
- You've lost 5 x Basket of Rubbery Pies
- You've lost 10 x Crate of Incorruptible Biscuits
- You've lost 5 x Solacefruit
- You've lost 1 x Cellar of Wine
- Tracklayers' Displeasure is dropping… (-5 CP, probably more; perhaps -7)
- You've gained 1 x Preserved False-Snake
- The Tracklayers have stopped because there are buried creatures in the way of their work. (Sets Tracklayers' Work Stoppage to 30 - Remains of a Prehistoric Creature)
Categories:
- Basket of Rubbery Pies
- Railway Steel
- Terrain Surveyed
- Crate of Incorruptible Biscuits
- Solacefruit
- Cellar of Wine
- Tracklayers' Work Stoppage
- Discovered: a Patch of Frozen Neath
- Actions
- Track Laid Gain
- Railway Steel Loss
- Supporting the Emancipationist Tracklayers Gain
- Basket of Rubbery Pies Loss
- Crate of Incorruptible Biscuits Loss
- Solacefruit Loss
- Cellar of Wine Loss
- Tracklayers' Displeasure Loss
- Preserved False-Snake Gain
- Tracklayers' Work Stoppage Gain